Skip to the main content block
::: Home| Sitemap| Podcasts|
|
Language
Featured Programs
繁體中文 简体中文 English Français Deutsch Indonesian 日本語 한국어 Русский Español ภาษาไทย Tiếng Việt Tagalog Українська Sitemap

Defense Minister confirms US fighter jet delivery delay

12/10/2026 18:58
Editor: Michelle Chiang
Taiwan, under the codename Phoenix Project, purchased 66 F-16 Block 70 fighter jets from the United States, originally scheduled for delivery by the end of 2026. (Photo: Reuters)
Taiwan, under the codename Phoenix Project, purchased 66 F-16 Block 70 fighter jets from the United States, originally scheduled for delivery by the end of 2026. (Photo: Reuters)

Defense Minister Wellington Koo (顧立雄) confirmed in the Legislature on Monday, October 12, that more new F-16V jets are expected to arrive in Taiwan by the end of the year, but he cannot guarantee that all ordered aircraft will be delivered by 2027.

KMT Legislator Lai Shyh-bao (賴士葆) inquired about the progress of the fighter jets at the Legislature's Foreign Affairs and National Defense Committee meeting, to which the defense minister stated that coordination with the U.S. is still ongoing.


Taiwan, under the codename Phoenix Project, purchased 66 F-16 Block 70 fighter jets from the United States, originally scheduled for delivery by the end of 2026. However, due to delays in production from manufacturer Lockheed Martin, only two aircraft have been delivered so far. Furthermore, Koo said that the Viper Shield electronic warfare system equipped on the new aircraft is still being integrated, but that everything is progressing within a controlled timeframe.

Koo detailed that the original schedule for completion by the end of 2026 has been delayed due to system integration issues regarding the Air Force's project to install the Automatic Ground Collision Avoidance System, commonly known as Auto-GCAS, on its existing F-16 Block 20s. He cited reports that the entire project will not be completed until 2028, but that two aircraft have already been equipped with the system, and subsequent modification kits and delivery schedules will be accelerated.

We use cookies to provide you with a better browsing experience.

By continuing to browse this site, you agree to our Cookie Policy. Learn more about our Privacy Policy

I understand
00:00
00:00
0.5x 1x 1.5x 2x